A.15-09-013 Line 1600
PHASE 2
Pleading - Line 1600 Test or Replacement Plan Cost Forecast for Phase 2
Direct Testimony (8/12/2020)
- SDG&E-1 Direct Testimony of Norm Kohls
- SDG&E-2 Direct Testimony of Ronn Gonzalez
- SDG&E-3 Direct Testimony of Claire Olegario
- SDG&E-4 Direct Testimony of Casey Butler
Workpapers (8/12/2020)
- Workpapers supporting Norm Kohls Testimony
- Workpapers supporting Ronn Gonzalez Testimony
- Workpapers supporting Casey Butler Testimony
Data Requests
SCGC
PHASE 1
Line 1600 Test or Replacement Plan (public)
Application
- Application - Volume 1 (09/30/15)
- Reply to Protests (11/12/15)
- Amended Application - Volume 1 (03/21/16)
- PEA Supplement - Volume II (03/21/16)
- Cost Effectiveness Analysis- Volume III (03/21/16)
Direct Testimony (03/21/16)
- SDGE-1 Direct Testimony of Doug Schneider
- SDGE-2 Direct Testimony of Travis Sera
- SDGE-3 Direct Testimony of David Bisi
- SDGE-4 Direct Testimony of Ali Yari
- SDGE-5 Direct Testimony of Jani Kikuts
- SDGE-6 Direct Testimony of Gwen Marelli
- SDGE-7 Direct Testimony of Deanna Haines
- SDGE-8 Direct Testimony of Neil Navin
- SDGE-9 Direct Testimony of Michael Woodruff
- SDGE-10 Direct Testimony of Jason Bonnett
- SDGE-11 Direct Testimony of John Roy
Updated Testimony (02/21/17)
- SDGE-3-R Updated Direct Testimony of David Bisi
- SDGE-4-R Updated Direct Testimony of Ali Yari
- SDGE-6-R Updated Direct Testimony of Paul Borkovich
- SDGE-7-R Updated Direct Testimony of Deanna Haines
- SDGE-8-R Updated Direct Testimony of Norm Kohls
Supplemental Testimony (02/21/17)
Rebuttal Testimony (06/12/17)
Legal Briefs
- Opening Brief - November 22, 2017
- Reply Brief - December 15, 2017
- Supplemental Opening Brief - January 22, 2018
- Supplemental Reply Brief - February 2, 2018
Proponent's Environmental Assessment (PEA) - Volume II
- FINAL PSRP 0 Coversheet
- FINAL PSRP 0 Table of Contents.pdf
- CHAPTER 1 – PEA SUMMARY
- CHAPTER 2 – PROJECT PURPOSE AND NEED/PROJECT OBJECTIVES
- CHAPTER 3 – PROJECT DESCRIPTION
- 4.1 AESTHETICS
- 4.2 AGRICULTURE AND FORESTRY RESOURCES
- 4.3 AIR QUALITY
- 4.4 BIOLOGICAL RESOURCES
- 4.5 CULTURAL, TRIBAL, AND PALEONTOLOGICAL RESOURCES
- 4.6 GEOLOGY, SOILS, AND SEISMICITY
- 4.7 GREENHOUSE GAS EMISSIONS
- 4.8 HAZARDS AND HAZARDOUS MATERIALS
- 4.9 HYDROLOGY AND WATER QUALITY
- 4.10 LAND USE AND PLANNING
- 4.11 MINERAL RESOURCES
- 4.12 NOISE
- 4.13 POPULATION AND HOUSING
- 4.14 PUBLIC SERVICES
- 4.15 RECREATION
- 4.16 TRANSPORTATION AND TRAFFIC
- 4.17 UTILITIES AND SERVICE SYSTEMS
- 4.18 CUMULATIVE ANALYSIS
- CHAPTER 5 – DETAILED DISCUSSION OF SIGNIFICANT IMPACTS
- CHAPTER 6 – LIST OF PREPARERS
- Attachment 1-A: Public Open House Invitations
- Attachment 1-B: Open House Comments
- Attachment 2-A: Historic Aerial Maps Attachment
- Attachment 3-A: Detailed Route Maps
- Attachment 3-B: Typical Construction Equipment List
- Attachment 4.1-A: Proposed Project Visual Character Photograph Viewpoint Locations
- Attachment 4.1-B: Visual Character Photographs
- Attachment 4.2-A: FMMP Lands Crossed by the Proposed Project
- Attachment 4.3–A: CalEEMod Reports
- Attachment 4.4-A: Biological Resources Technical Report
- Attachment 4.4-B: Special-Status Plant Species with Potential to Occur
- Attachment 4.4-C: Special-Status Wildlife Species with Potential to Occur
- Attachment 4.6–A: Geologic Hazard Assessment
- Attachment 4.8-A: Phase I Environmental Site Assessment
- Attachment 4.8-B: Safety Study
- Attachment 4.8-C: Wildland Fire Threat Map
- Attachment 4.8-D: SDG&E Operations and Maintenance Wildland Fire Prevention Plan
- Attachment 4.9-A: Water Quality Construction Best Management Practices Manual
- Attachment 4.9-B: National Wetlands Inventory Map
- Attachment 4.9-C: FEMA Flood Hazard Zones Map
- Attachment 4.10-A: Local Land Use Plans and Policies Consistency Analysis
- Attachment 4.10-B: General Plan Land Uses
- Attachment 4.10-C: Existing Land Uses
- Attachment 4.12-A: Noise Contour Maps
- Attachment 4.12-B: Noise Monitoring Results
- Attachment 4.16-A: Traffic Analysis
- Attachment 4.16-B: Estimated Truck Trips Required to Deliver Recycled Water for Construction
- Attachment 4.17-A: Water Usage Estimates
Workpapers
- PSRP WPs - Cost Effectiveness Analysis.zip
- PSRP WPs - Navin.zip
- PSRP WPs - Woodruff.zip
- PSRP WPs - Bonnett.pdf
Data Requests
Turn
ORA
- ORA-01
- ORA-02
- ORA-03
- ORA-04
- ORA-05
- ORA-06 (Amended)
- ORA-07 (Amended)
- ORA-08
- ORA-09
- ORA-10
- ORA-11
- ORA-12
- ORA-13
- ORA-14
- ORA-15
- ORA-16
- ORA-17
- ORA-18
- ORA-19 (Amended)
- ORA-20
- ORA-21
- ORA-22
- ORA-23
- ORA-24
- ORA-25 (Amended)
- ORA-26
- ORA-27
- ORA-28 (Amended)
- ORA-29
- ORA-30
- ORA-31
- ORA-32
- ORA-33
- ORA-34
- ORA-35
- ORA-36 (Amended)
- ORA-37
- ORA-38
- ORA-39
- ORA-40
- ORA-41
- ORA-42
- ORA-43
- ORA-44
- ORA-45
- ORA-46
- ORA-47 (Amended)
- ORA-48
- ORA-49
- ORA-50
- ORA-51
- ORA-52 (Amended)
- ORA-53
- ORA-54
- ORA-55
- ORA-56
- ORA-57
- ORA-58
- ORA-59
- ORA-60 (Amended)
- ORA-61
- ORA-62
- ORA-63
- ORA-64 (Amended)
- ORA-65
- ORA-66 (Amended)
- ORA-67
- ORA-68
- ORA-69
- ORA-70
- ORA-71
- ORA-72
- ORA-73 (Amended)
- ORA-74
- ORA-75
- ORA-76
- ORA-77
- ORA-78
- ORA-79
- ORA-80
- ORA-81
- ORA-82
- ORA-83
- ORA-84
- ORA-85
- ORA-86
- ORA-87
- ORA-88
- ORA-89
- ORA-90
- ORA-91
- ORA-92 (Amended)
- ORA-93
- ORA-94
- ORA-95
- ORA-96
- ORA-97
- ORA-98
- ORA-99
- ORA-100
- ORA-101
- ORA-102
- ORA-103
- ORA-104
- ORA-105
- ORA-106
- ORA-107
- ORA-108
UCAN
Sierra Club
- Sierra Club DR 01
- Sierra Club DR 02
- Sierra Club DR 03
- Sierra Club DR 04 (Amended)
- Sierra Club DR 05 (Amended)
- Sierra Club DR 06
- Sierra Club DR 07
- Sierra Club DR 08
- Sierra Club DR 09
- Sierra Club DR 10
SCGC
- SCGC DR 1
- SCGC DR 2
- SCGC DR 3
- SCGC DR 4
- SCGC DR 5
- SCGC DR 6
- SCGC DR 7
- SCGC DR 8
- SCGC DR 9
- SCGC DR 10
- SCGC DR 11
- SCGC DR 12
- SCGC DR 13
- SCGC DR 14
- SCGC DR 15 (Amended)
- SCGC DR 16
- SCGC DR 17
- SCGC DR 18
- SCGC DR 19
- SCGC DR 20
- SCGC DR 21
- SCGC DR 22
- SCGC DR 23
- SCGC DR 24
- SCGC-25
- SCGC-26